Gapped text
Restoring a Hill Path
Six sentences have been removed from the text. Choose the sentence (A–G) which fits each gap. There is one extra sentence.
A popular footpath above the village of Northmere had become so badly eroded that walkers were creating new tracks around muddy sections. This widened the damaged area and exposed tree roots on the slope. The local walking group initially proposed covering the worst sections with gravel.
37Before ordering materials, however, they asked a landscape specialist to inspect the route. The walking group photographed repairs and noted weather conditions, allowing later volunteers to see which techniques survived repeated rain. Local farmers contributed advice about soil and water movement because they knew the hillside from working nearby land. The specialist explained that water, not foot traffic alone, was causing most of the damage. Rain from higher ground was flowing directly down the path and carrying loose soil with it.
38Any repair that ignored this movement of water would therefore last only a short time. The group's first task became controlling drainage rather than rebuilding the surface. Walkers had complained about the mud for years, but previous attempts to add loose material had washed away quickly. Volunteers dug shallow channels that guided water away from the path at several points. They also placed large stones where walkers naturally stepped over wet ground.
39Because the stones were gathered nearby, the repaired sections looked less artificial than the group had expected. The specialist visited after rainfall so the direction of surface water could be seen rather than guessed from dry ground. The work also revealed sections that looked badly damaged but were actually stable once surface water had been redirected. The work had to be completed gradually. Carrying heavy material up the hill was difficult, and closing the whole route would have pushed walkers onto fragile ground elsewhere.
40Small areas were repaired one at a time, with temporary signs directing people around each work site. Volunteers learned to position drainage channels carefully because sending water onto another fragile area would simply move the problem. The group also changed how it communicated with walkers. Earlier notices had simply asked people to stay on the path. New signs briefly explained how stepping around mud caused the damaged area to spread.
41Volunteers noticed that people were more willing to follow a request when they understood the reason behind it. Work parties were kept small to reduce trampling and to make it easier for experienced volunteers to supervise unfamiliar tasks. Two years later, vegetation has returned beside several repaired sections and fewer new tracks are appearing. The group still inspects the route after heavy rain.
42They now see maintenance as an ongoing process of observing how the hill responds, not as a job that can be completed once and forgotten. The group also recorded which repairs survived winter storms, using those observations to adjust later sections of the route.